Ohio.gov  |   State Agencies   |   Online Services

Workshops

Case Study Workshops

The objective of the Best Local Land Use Case Studies developed for the Ohio Lake Erie Commission is to illustrate a “triple bottom line” (i.e., financial, community, and environmental) decision-making process for developing site plans for multi-objective land development projects. These case studies have been assembled in a format that can be distributed as well as used in case study workshops with developers, local governments, and their design and/or review professionals.

A series of 4 workshops were scheduled for May 2010 utilizing the Case Studies and the decision-making process.  Materials, information on the workshops, and registration details are included below. 

Workshop Dates

Engineering Sessions

CEU's Available - 7 hrs - Engineers, Surveyors, Planners, and Landscape Architects.

May 4, 2010 - Cleveland State University

May 5, 2010 - Toledo Museum of Art

General Technical Sessions

CEU's Available - 5 hrs - Engineers, Surveyors, Planners, and Landscape Architects.

May 12, 2010 - Cleveland State University

May 13, 2010 - Toledo Museum of Art

  Workshop Materials

Engineering Sessions 

Presenters

John Aldrich, PE, D.WRE

Mark McCabe, CPESC

Kirby Date, AICP

Chris Riddle, MPA

Leonardo Sferra, PE

Workshop Materials & Answer Keys

American Rivers LID Manual (external link)

2010 Stormwater Conference (external link)

General Sessions

Presenters

Kirby Date, AICP

Chris Riddle, MPA

 

 

Workshop Materials & Answer Keys

 

  Workshop Sponsors


Ohio Lake Erie Commission
     CSU - Maxine Goodman Levin College of Urban Affairs     NW Ohio Planning

     TMACOG        Cleveland APA        ARRA Logo        NOAA        Office of Coastal Management                  

Lake Erie Protection Fund

This project was developed with financial assistance provided by the Coastal Zone Management Act of 1972, as amended, in award number NA07NOS4190076 administered by the Office of Ocean and Coastal Resource Management, National Oceanic and Atmospheric Administration and the Ohio Coastal Management Program, administered by the Ohio Department of Natural Resources, Office of Coastal Management.

This project was funded in part through the Lake Erie Protection Fund.  The LEPF is supported by the voluntary contributions of Ohioans who purchase the Erie... Our Great Lake license plate featuring the Marblehead lighthouse.

Financial assistance provided under award number NA09NOS4200139 from the National Oceanic and Atmospheric Administration, U.S. Department of Commerce through the Old Woman Creek National Estuarine Research Reserve, administered by the Ohio Department of Natural Resource, Division of Wildlife.

The Old Woman Creek National Estuarine Research Reserve is part of the National Estuarine Research Reserve System, (NERRS), established by Section 315 of the Coastal Zone Management Act, as amended.  Additional information about the system can be obtained from the Estuarine Reserves Division, Office of Ocean and Coastal Resource Management, National Oceanic and Atmospheric Administration, US Department of Commerce, 1305 East West Highway - N/ORM5, Silver Spring, MD 20910.

The Ohio Coastal Training Program is a partnership of the Ohio Department of Natural Resources Division of WIldlife and Office of Coastal Management, Old Woman Creek National Estuarine Research Reserve, Ohio Sea Grant College Program, and the Ohio Lake Erie Commission.

This project was financed in part through a grant from the Ohio Environmental Protection Agency and the United States Environmental Protection Agency, with funds from Section 604b of the Clean Water Act, and the members of TMACOG.  The contents and views, including any opinions, findings, or conclusions or recommendations, contained in this project are those of the authors and have not been subjected to any [if applicable] U.S. EPA or Ohio EPA peer or administrative review and may not necessarily reflect the views of either Agency, and no official endorsement should be inferred.

Workshop Materials

 May 4 - 5 - Engineering Workshops

Section 2 - Introduction

Section 2 - BMPs

Section 3 - Considerations Affecting Development

Section 4 - Objectives & Performance Standards

Section 5 - Site Layouts

Section 5 - Answer Key

Section 6 - Sizing & Siting Controls - Pt 1

Section 6 - Sizing & Siting Controls - Pt 2

Section 6 - Handouts

Section 6 - Answer Key - 1 of 4

Section 6 - Answer Key - 2 of 4

Section 6 - Answer Key - 3 of 4

Section 6 - Answer Key - 4 of 4

Section 7 - Triple Bottom Line Business Case

Section 7 - Handouts

Section 7-  Answer Key

Section 8 - Maps & Figures - Pt 1

Section 8 - Maps & Figures - Pt 2

Section 8 - Maps & Figures - Pt 3

Section 9 - Additional Resources

Participants List - May 4

Participants List - May 5

 May 12 - 13 - General Technical Workshops

Participants were provided all materials from May 4-5 workshop with the following changes:

New materials were provided for the following sections:

Section 2 - BLLUP & Project Objectives - Pt 1

Section 2 - BLLUP & Project Objectives - Pt 2

Section 5  - Process, Calculations, & Costs - Pt 1

Section 5 - Process, Calculations, & Costs - Pt 2

The original sections from Week 1 were moved as follows:

Section 2 from Week 1 workshops was moved to Section 9 as additional materials.

Section 5 from Week 1 was moved to the front of Section 6

Answer Keys remain the same as do all other materials.

Participants List - May 12

Participants List - May 13

Case Study Site Redesign Sample #1

Case Study Site Redesign Sample #2

Case Study Site Redesign Sample #3

Case Study Site Redesign Sample #4

Case Study Site Redesign Sample #5